Street guide

Decorating the listed fronts of Holland Park Mews

Holland Park Mews is a service street that the listing refused to treat as a leftover. It is grade II for its heritage significance and for its relationship to the Holland Park houses. Those houses were designed by Francis Radford and built between 1860 and 1879, and the whole group, unusually including the mews, is grade II listed. Entry is under a west arch of channelled blockwork, with a carriage opening and two openings for people on foot. Ground floors keep painted timber carriage doors, stone steps and metal windows that once ventilated stalls. First floors keep timber sashes of ten-over-ten panes. The ground itself is granite setts, with no pavements. A decorating brief that starts from a cottage with a garage has already missed the building.

Listed with the houses, which is the unusual part

It would be easy to file a mews as a yard behind the houses that matter. The appraisal does the opposite, and it does so in two complementary ways. Holland Park Mews is grade II listed for its heritage significance and its relationship to the Holland Park houses. Separately, Francis Radford's houses, built between 1860 and 1879, are described as a group whose listing, unusually, takes in the mews. The yard is not an afterthought in the record. It is part of why the group is grade II.

The relationship is architectural as well as a matter of designation. This was the service building for those houses. Stall windows, wide carriage doors and a former staff entrance above stone steps are the plan of that service, and they are still legible. Decorating does not have to turn a house back into a stable. It does have to avoid pretending the front was always a cottage with a domestic garage door. Photographs of the whole elevation, from sett to balustrade, are what make that reading possible before a product is chosen.

The west arch, its plaque and the guard stones

The mews is entered through an arch at the west end. It has the character of a triumphal arch, finished in channelled blockwork, with three openings: one for carriages and two flanking arches for pedestrians. The name is given on a large plaque, and a balustrade tops the plaque. The arch is the public face of the street, seen before any house. Channelled blockwork is cut or modelled to read as blocks. If it is already painted, the channels are kept open, in the same spirit as any channelled front. If it is not painted, it is not given a coat merely so that it matches a painted house further in. The appraisal does not describe the arch as painted stucco, so the material is confirmed before a system is chosen.

Under the arch, granite guard stones protect the opening from damage. They stand where a wheel would otherwise strike the blockwork. They are granite, not painted kerbs, and they are not a convenient edge to load with boards. The carriage opening is also the way materials come in and out. It has to remain passable. Overspray on the guard stones, or on the plaque, is avoided because both belong to the composition the appraisal describes: the name, the balustrade, three openings, and the stones that protect the arch from damage.

Carriage doors, stall lights and ten-over-ten sashes

Wide painted timber carriage doors occupy the ground floor. A small storage cupboard sits under the steps. The steps are stone, and they rise to a central entrance that served the staff accommodation above. Beside the steps, many metal windows remain, with pivoting openers that would have ventilated the stalls. Most of the first-floor windows survive as timber sashes of ten-over-ten panes. On one narrow front that is several different tasks. The carriage door is painted timber, wide, and often the only way into the ground floor. The cupboard door is a smaller timber item, stuck in the shadow under the stone. The stall windows are metal, with pivots, and they need a coating for metal, not a trim paint chosen for a sash. The upper windows are timber, ten panes over ten panes, with glazing bars thin enough to disappear under a careless film.

The appraisal also records the harm. Some units have oversized or modern garage doors, and that has damaged the integrity and uniformity of the group. Paint can maintain a later door. It does not convert that door into the wide timber carriage door the mews was built with. A schedule should say which door is there. Stone steps are covered while the former staff door and the cupboard below are painted. They are not coated to freshen them. The pivoting metal lights are left able to move. Seizing a pivot under a skin of paint removes the ventilator the window was.

Beaded balustrades, and brick the appraisal is glad to see

Above the cornices are beaded stucco balustrades, divided by party walls. Most remain intact, and they are one of the things that unite the group. Beading on a baluster is a small profile. It fills solid if paint is piled into it, so the work is as much about what is left alone as about what is added. Party walls break the balustrade into house lengths without breaking the idea of a single mews. Stopping a colour hard at a party pier is right. Changing the sheen from one unit to the next, on balustrades the appraisal praises for uniting the group, is the change that shows.

A few mews remain unpainted, or have had their paint removed. The appraisal calls that a welcome reinstatement of the original brick finish. The original surface was brick. A front that has been returned to brick is not a candidate for a coat whose purpose is to match a neighbour still painted. The welcome in the text is specific. It is not a general enthusiasm for bare masonry everywhere, and it is not a claim that every painted unit must now be stripped. It is a judgement about the fronts where brick can be seen again. Those fronts are photographed and left out of the painted schedule.

Slate behind the parapet, and the extensions that spoil it

Most units have kept shallow pitched slate roofs, concealed behind the parapets. The roof is easy to forget because it cannot be seen from the setts in the ordinary way, and it is easy to mark when the parapet and the balustrade are coated from above. Slate is identified before that work starts. It is a roof covering, not a paint surface. Very few units have harmful roof extensions. Where they exist, the appraisal says they spoil the uniformity, the diminutive form and the special character of these former service buildings.

Diminutive is the right scale to keep in mind. The mews was a service building, lower and simpler than the houses it served. An extension that breaks the parapet line is described as the exception. It is not absorbed into a phrase such as the roofline, as though the group had always had rooms pushed up into the sky. Painting the cheeks of such an extension, if they are already painted, is maintenance of the exception. It is not an opportunity to make the addition look original by sharing a colour with the balustrade.

Setts from wall to wall, and no pavement to stand on

The entire mews is paved in granite setts, running from one side to the other without pavements. The appraisal treats that paving as an important feature. There is no footway on which to stack a board, and no kerb that separates people from the working width. Residents pass along the same setts that carry the access. The setts are granite. If paint marks them, they are cleaned. They are not painted in the hope of a tidier ground. Guard stones at the arch stay visible, because they still have the job of keeping traffic off the blockwork.

That absence of a pavement changes the order of the job more than any choice of colour. Protection goes down before anything is rubbed back overhead. Stall windows and carriage doors open almost onto the setts, so a wet edge and a wet stone meet. The enquiry is clearer when it says whether the brick is painted or bare, whether the door is a timber carriage door or a later garage door, and whether a roof extension breaks the parapet. Holland Park Villas, Addison Road and the Holland Park area guide cover the larger houses and the streets around this yard. Exterior painting for the mews is the service that has to cope, on one front, with timber, metal, beaded stucco and brick that may deliberately have been uncovered.

Sources for this page

The building points above are taken from the documents linked here. Preparation, protection and the order of work are general decorating practice, and they are not quotations from those documents.

Sources

Questions about Holland Park Mews

Is Holland Park Mews listed in its own right?

Yes. It is grade II listed for its heritage significance and its relationship to the Holland Park houses. Those houses were designed by Francis Radford and built between 1860 and 1879, and the whole group, unusually including the mews, is grade II listed.

What survives of the stable front?

Wide painted timber carriage doors, a storage cupboard under stone steps, and many metal windows with pivoting openers that ventilated the stalls. Most first-floor windows are timber sashes of ten-over-ten panes. Some oversized or modern garage doors have damaged the uniformity of the group.

Should bare brick in the mews be painted to match?

A few mews remain unpainted, or have had paint removed. The appraisal calls that a welcome reinstatement of the original brick finish. A front returned to brick is not painted simply to match a neighbour. Beaded stucco balustrades above the cornice are a separate material.

Why do the setts matter to the decorating?

The whole mews is paved in granite setts from side to side, with no pavements, and granite guard stones under the west arch protect the opening. There is no separate footway to stand on, and the setts are a feature to protect rather than a surface to coat.

Your next step

Photograph the front from the setts to the parapet.

Include the carriage door, any metal stall window, the ten-over-ten sash, and a note of whether the brick is painted or has been returned to bare brick.

Send an enquiry

Tell us about your property and the work you have in mind.

Prefer to speak or send a message? Call 020 7101 3168 or WhatsApp 07459 345456.