Which block, and from which campaign
The appraisal describes Oakwood Court as a very fine group of mansion blocks with a private central garden at the north end, consisting mostly of Queen Anne Revival style blocks designed in 1899, probably mainly to the designs of William G. Hunt, with nos. 31-62 completed in 1930 to the designs of Richardson and Gill in an Art Deco style. The Queen Anne blocks are seven storeys high over half basements, faced in smooth orange-red bricks with Bath stone dressings to the windows and entrances, although those dressings have been painted white.
A communal specification therefore starts by naming the block. The Art Deco blocks are the only ones with a drive and are designed around their own courtyard; they are more austere, faced in a less lively brick with only brick or minimal terracotta dressings including many decorative vents, with metal framed windows that have a very fine and elegant frame and glazing bars, and no balconies. Nothing written for one campaign describes the other.
Entrances: painted stone, oak and glass
The entrances are called a key feature. They have polished oak doors and over- and side-lights set in a double arched Classical entrance way, undoubtedly in Bath stone but since painted over. On the Art Deco side there are three entrances set beneath simple projecting canopies with polished oak doors, all accessed from the courtyard. Nos. 1, 2 and 3 Oakwood Mansions at the east end are smaller again, three storeys and four bays wide, with a Bath stone doorcase with pilasters, console brackets and segmental pediment, and a mahogany door with a glazed top panel the appraisal calls unsympathetic.
Three different materials meet at those thresholds. Painted stone is maintained as a previously coated surface, with the coating named for what it is rather than described as stonework. Polished oak and mahogany are protected and maintained as timber finishes, not painted over for convenience. Over- and side-lights are glazed joinery with their own masking and cutting-in. A schedule that separates those three lines is the one that survives a service charge consultation.
Mosaic paths, railings and lightwells
The wide paths have mosaics in attractive patterns which are all intact and mostly to the same design. Intact is the operative word: a path like that is protected before any washing or preparation starts, because a single spillage or a dragged ladder foot does damage that no decorating line can repair. Boards and barriers are planned to suit the path, not the other way round.
A complete set of thick original cast iron railings encloses all the blocks and ties in the two different styles of building. That continuity argues for treating the railings as one item with one agreed finish across the group rather than block by block. To the rear, the blocks are deep and finished with tightly packed yellow stock brick canted bays in pairs, punctuated by deep lightwells. Lightwells are access and safety questions as much as surfaces, and they are listed separately in any programme.
Shared stairs, halls and the fire classification
Where the work includes internal common parts, one requirement sits above the decorative choices. Approved Document B sets a minimum lining classification of B-s3, d2 for circulation spaces including the common areas of blocks of flats, so a wall or ceiling coating in a shared stair, hall or landing is checked against that classification as well as against the look of the entrance. That check belongs in the specification, not in a conversation afterwards.
The rest is sequencing around residents. A communal stair is the only route to many front doors, so work is planned so that no resident is left without a usable way in or out, and dust, odour and drying times are managed around that. Flat entrance doors facing a common stair often belong to leaseholders rather than the freeholder, so the scope says explicitly whether they are included.
Roofs, courtyard and the garden at the front
The roofs are clay tiled and take the form of a mansard with dormers, but are flat on top. Dormers mean painted joinery at height; a flat top is part of the building rather than a contractor's working platform, and any use of it is agreed with whoever manages the block. At ground level, the appraisal records communal gardens to the rear of Upper and Lower Addison Gardens and Addison Crescent, and one to the front of Oakwood Court, while the Art Deco blocks have their own courtyard and drive.
Those spaces are the only places staging, skips and materials can go, and they are also what residents look at and walk through. A programme says where each will be placed, for how long, and how refuse and delivery routes keep working. On the Queen Anne blocks the frontage detail adds its own constraints: turret features on the Addison Road frontage create an entrance into the Court, and tall chimneys with stone banding and terracotta pots sit above.
How a block programme is priced
Repetition and height drive the quantities. Seven storeys over half basements with dormers above, almost full height canted bays joined by shallow balconies with iron railings, French doors and white painted sashes of six panes over one on the earlier blocks, and metal framed windows with slender glazing bars on the later ones all generate different rates of progress. A complete run of original railings is a long, continuous metalwork item.
Condition and consent complete the picture. Previously painted Bath stone, deep lightwells, intact mosaic, polished oak and a mahogany door with a later glazed panel each carry their own preparation. Where listing applies, Historic England's distinction matters: like-for-like external redecoration matching paint type, texture, finish and colour usually does not need listed building consent, while painting a currently unpainted surface is likely to need it. Everything is set out in a written, itemised quotation after the blocks and entrances have been walked with whoever manages them.
Sources for this page
The building points above are taken from the documents linked here. Preparation, protection and the order of work are general decorating practice, and they are not quotations from those documents.