There is no single figure for a Holland Park house
People ask what it costs to paint a Holland Park house as if the conservation area were one product. It is not. Francis Radford's houses, built between 1860 and 1879, are a listed group of closely spaced villas, fully stuccoed where they face a street and stock brick on the other flanks, with plain sashes in canted bays and ornament above a cornice. James Hall's nos. 62 and 64-84 on Addison Road are two storeys over half basements, stucco to the front only. Holland Park Mews is a setted lane of former service buildings. Holland Park Court and Carlton Mansions are a handed pair of red brick blocks. A single figure for all of them would be a fiction. This guide refuses that fiction.
What a quotation can do is show the lines that differ from one address to the next, after someone has seen them. The pricing page explains how a quotation is set out, without this guide repeating a sum. The contact page is where the address is sent so that a visit can be arranged. Until that visit, a sum guessed from the area name is not a quotation.
Access follows the building, and it is itemised on its own
Height and the shape of the approach change the work before a brush is chosen. On the Radford houses, canted bays rise to the first floor and three ornamented dormers sit above a modillioned cornice, linked by a balustrade. Reaching cornice, dormer and balustrade is not the same task as painting a door. The houses also have square-section stucco bottle balustrades and cast iron around the lightwells, so the upper stucco and the area iron are both in the access note. Hall's Addison Road villas are lower in storey count, two storeys over half basements, but they still carry a bottle balustrade, a Tuscan porch and blocked quoins that cannot be reached from the pavement with a domestic step.
The ground changes the note again. The entire Holland Park Mews is paved in granite setts from one side to the other, without pavements. There is no footway to treat as a standing place. Boards, materials and the way residents pass have to be planned on the setts themselves, across the full width of the lane. On Holland Park Avenue and Holland Park Gardens the original black railings protect front areas that give access to coal cellars and former servants' quarters. Those areas are the working edge as well as the historic one. Scaffold, boards or any other access equipment cannot ignore the drop, the rail, or the opening below.
Addison Road's stucco villas have large front gardens, mostly paved in granite setts in a scalloped formation, and a substantial stuccoed boundary wall with carriage entrances at each end. The entrances are both a way in and a piece of stucco to protect. They are not a general loading bay, and the scalloped wall is not a place to lean boards without a thought. Access equipment and permits are confirmed for the address and itemised separately from the painting. They are not assumed from a street name, and they are not folded into a single undecorated lump so that the painting line quietly contains them.
Listing, ordinary repainting and estate consent
Consent changes a quotation when it changes what may be specified, or when it has to be settled before the work is agreed. It is not an addition invented for every old house. Historic England advises that like-for-like external redecoration, matching paint type, texture, finish and colour, usually does not need listed building consent. Painting a currently unpainted surface on a listed building is likely to need it. The Planning Portal says ordinary repainting of a house does not need planning permission, with listed buildings and Article 4 areas as the exceptions to check.
The Radford group, unusually including the mews, is grade II. That fact tells you the family of buildings. It still has to be confirmed for the particular door you are painting. A like-for-like renewal of pale paint on stucco that is already painted is a different consent position from a proposal to coat stock brick that is currently bare. On Holland Road the complete painting of stock brick is already described as harm. On the mews, brick left unpainted or revealed again is welcomed. A quotation that includes painting that brick is pricing a change the appraisal does not support, and on a listed building it may be pricing work that needs consent before it exists.
Written consent from the Ilchester Estates is required for any external alteration to the appearance of a house on the estate, in addition to planning permission or listed building consent from the borough. Whether the address is on the estate is a paper question. The quotation can note that the consent is outstanding, or that papers have been seen, but it cannot decide the estate's answer. Time spent waiting on a consent is not disguised as preparation. It is its own item, or it is excluded until the answer exists. The specification does not change colour, finish or the decision to coat a bare surface in order to dodge that question.
Surface condition and what is actually repaired
Two elevations with the same silhouette can need different preparation, and preparation is a large part of why quotations diverge. Sound paint is washed down and kept. Failed paint is cut back to a firm edge. Cracks that are within the decorating scope are filled. Open mouldings are made good only so far as the profile can be kept, not rebuilt in paint. Bare timber is primed. Previously painted stucco receives a coating suited to that stucco. Bare brick does not receive that coating so that a flank matches a front.
The quotation should say which of those conditions were seen. A cracked stucco bay, a bottle balustrade with open joints, a sash with bare cills, and a railing with loose rust are separate lines because they are separate amounts of work. If something looks structural, or if a crack is outside decorating, the item says so and stays out of the paint figure rather than being given a hopeful allowance. The Holland Road harms, painted stock brick among them, are a reminder that making it all one colour is sometimes the wrong scope, not the efficient one. Excluding that painting can lower the scope. It is still the right scope.
Older paint may contain lead, and the precaution is part of the brief
HSE notes that lead pigments were widely used in household paints until the 1960s, so older paintwork on these houses may contain lead. That possibility changes how preparation is described and itemised. It does not change it into a drama, and it does not change it into a burning-off exercise. Leaded paint must not be overheated with blow lamps or gas torches. Sound old paint is left in place. Only paint that is flaking, chipping or dusting is stripped back.
A quotation that assumes every sash and every railing will be taken to bare substrate has assumed the opposite of this guidance, and it has assumed a quantity of labour the building may not require. The honest line is conditional: sound paint remains; failed paint is cut back; bare timber is primed; heat of the blow-lamp kind is not the method. If a later inspection finds more failed film than the first visit could see, that is a variation, agreed before it is done, not a silent extra. Occupied rooms under the work are protected so that dust from the preparation that does happen is not walked through the house.
The specification states the system, the joinery and the iron
How many coats, and of what, is a sentence in the specification for that surface. It is not a number this page is willing to invent, because a previously painted stucco wall, a primed cill and a cast iron rail are not the same system. The quotation names the system against each line. A reader can then see whether the stucco, the sash and the railing have been thought about separately. If the system is still to be chosen, the quotation says that, instead of hiding a guess inside a round sum.
Joinery and iron add detail that a wall area will not show. Plain sashes in a canted bay, a bottle balustrade of many balusters, lightwell railings, porch columns and a panelled door are all slow edges. They are itemised as joinery or metal, not dissolved into 'the front'. The same is true indoors when doors, linings and stair parts are in the brief. Detail is a cost driver because it is time and care. It is shown as detail, so two quotations can be compared without pretending that a flat wall and a bay window are the same task.
Occupied houses and shared entrances in mansion blocks
An occupied house changes protection, the route for materials and the rooms that must keep working. Floors, stairs and furniture on the route are covered. That covering is a line, because a villa with rooms still in use is not an empty site. It is also a reason the visit asks who will be there and which entrances must stay open. None of that is folded into the painting as an unexplained addition. It is work that either is in the quotation or is not.
Communal buildings add a shared door and a shared decision. Holland Park Court and Carlton Mansions are a handed pair of red brick mansion blocks built c.1900, of four storeys over half basements, with an original mansard, the pair handed so that both halves match. Holland Park Mansions, no. 16 Holland Park Gardens, has an elaborate central entrance and polished oak double doors, with sashes multi-paned above and plain below. The oak doors and the shared entrance are not a private flat's woodwork. The quotation says whether the common entrance, the oak doors and the exterior of one block or of the pair are included. It says who can approve that work. Matching halves are a reason to ask whether one half painted alone would break the pair, not a reason to assume both blocks without instruction.
Red brick on those blocks is not a stucco villa specification, and the oak is not a softwood door to be treated casually. Commercial and shared decorating is the right service heading when the entrance is common. The visit still looks at the particular doors, the particular storeys in the brief, and the way materials reach them.
How we quote
The sequence is short, and it is the same sequence whatever the street. We visit the address. We separate stucco, brick, tile, timber and iron, and we separate what is already painted from what is bare. We note access, including the dormers and balustrades of a villa, the lack of pavements in the mews, the front areas on the avenue and the gardens, and the carriage entrances on Addison Road. We note listing papers and any Ilchester Estate position you already know. We note failed paint, sound paint and the lead precaution. We then write an itemised quotation. Access equipment and permits are confirmed for that address and itemised separately.
You should be able to read the quotation against the building. If a line is missing, or if bare brick has been included in a coating it should not receive, the visit has not been written down properly. The pricing page is there so the shape of a quotation is familiar before the visit. It is not a menu of sums, and neither is this guide. Send the address when you want the visit.
- The address, and which elevations or rooms are in the brief.
- Each material, and whether it is already painted or still bare.
- Preparation actually seen: failed paint, cracks in scope, bare timber, loose rust.
- The coating system stated against each surface, without a guessed number of coats.
- Joinery and ironwork as their own lines.
- Access equipment and permits, confirmed for the address and itemised separately.
- Consent or estate papers still outstanding, kept distinct from the painting.
- Protection and routes where the house or the shared entrance stays in use.
Sources for this page
The building points above are taken from the documents linked here. Preparation, protection and the order of work are general decorating practice, and they are not quotations from those documents.
Sources